








Product Parameters
What is Drill Pipe?
Drill pipe, is hollow, thin-walled, steel or aluminium alloy piping that is used on drilling rigs. It is hollow to allow drilling fluid to be pumped down the hole through the bit and back up the annulus. It comes in a variety of sizes, strengths, and wall thicknesses, but is typically 27 to 32 feet in length (Range 2). Longer lengths, up to 45 feet, exist (Range 3).
How to Work with Drilling Pipe?
The drilling tool is connected drill rod for transferring power. The drill string is usually part are: drill, drill collars, drilling pipe, stabilizers, special connectors and Kelly. The basic role of the drill string are: (1)control the drill bit; (2) imposed WOB; (3) transmission of power; (4) transporting drilling fluid; (5) special operations: extrusion of cement, handling underground accidents.
Drilling pipe is trailing with screw thread for connecting the drilling rig located at the bottom of surface drilling equipment and mill equipment or bottom outlet device. The purpose is to drill the drilling mud delivered to the drill bit, and drill with the increase, decrease or rotating bottom outlet means. Drill pipes must be able to withstand great external pressure, twisting, bending and vibration. In the mining and oil and gas refining process, the drill pipe can be used multiple times.
Drill Pipe: Drill pipe includes pipe body and tool joints(box and pin) welded together, used to connect drilling rig surface equipment and bottom equipment or bottom hole equipment. Drill pipe can bear heavy internal and external pressure, and twist, bend and vibration which can be used more than one time during oil or gas production.
Drill pipes are steel tube fitted with threaded ends called tool joints, which are commonly used in tension in the top part of the drill string to pump fluid and transmit torque to the bit.
Standard: Drill pipe
Grade: E75, X95, G105, S135
The wear-resistant belt of tool joint: Arnco 100XT, 200XT, 300XT, 400XT
Internal coating drill pipe: TK34, DPC, TC2000, TC3000
Usage: Mine blasting, water well drilling, geothermal wells drilling, fore poling, coal and nonferrous metal mining projects, etc.
API 5DP Specification is under the jurisdiction of the API Committee on Standardization ofTubular Goods. The purpose of this specification is to provide standards for drill pipe suitable for use in drilling and producing operations.
Special Processes of API 5DP Specification for Drill Pipe Special Processes are the final operations which are performed during pipe manufacturing that affect attribute compliance required in this document (except chemistry and dimensions). The applicable special processes are heat treatment, nondestructive testing, and, if applicable, cold finishing
Chemical Composition(%):
Mechanical Properties:
Dimension:
Factory Display
FAQ
Q: Are you trading company or manufacturer ?
A: We are professional manufacturer with 20 years' experience, and our company also is a very professional a trade company for steel products.We can also provide a wide range of steel products.
Q: Will you delivery the goods on time?
A: Yes,we promise to deliver on time,indemnity clause in contract terms will work if we couldn't.
Q: Do you provide samples ? Is it free or extra ?
A: The samples are free,you just need to pay the courier freight.
Q: How could you guarantee your products?
A: Products are manufactured by certified workshops, inspected by professional inspector.
Q: Do you accept the third party inspection?
A: Yes, absolutely we accept.
Q: How do we trust your company?
A: We specialist in steel business for many years, authenticated by SGS,welcome to visit our factory.
Q: What's your advantages?
A: Our own production lines make the good prices and high quality possible and seasoned workers serve you 7*24 hours.
Q: Can you produce the products according to my own drawings?
A:Yes,we can produce the products according to your drawings that will be most satisfy you.
Q: What is your Payment?
A: 100% T/T advance , Western Union (For Small Order)
B: 30% T/T and balance 70% before the shipment
C: 100% Irrevocable LC at sight (For Big Order)
Q: How long is the Delivery time?
A: 7~20 working days after confirming the payment.
If the order is urgently, we will push our workshop finish in advance.
Product Recommendation
GET IN TOUCH








